Mr and Mrs H from Shoreham wanted to update their bathroom in their large semi-detached house. They wanted to get rid of the bath and install a large shower enclosure, so they got in touch about our bathroom fitting services.
The work was quite extensive as it involved a complete strip out, renewing rotten joists, re-running pipework, relaying parts of the floor and building new walls to square and level out the old ones. I also fitted a dual fuel towel rail so that they could have warm and crisp towels throughout the warmer months when the heating system was switched off.
The new thermostatic shower valve provided a great, evenly warm showering experience from the combi boiler in the spacious 1200mm enclosure. Mr and Mrs H were very happy with the work I did for them and it was completed inside the two weeks estimated for the work.
Below are some photos of the job from start to finish. A big improvement I think you’ll agree!