Just finished a big job consisting of 2 bathrooms in the same property at the same time. I allowed 3 weeks from start to completion and was pleased that we finished the job completely within that time. Obviously the customer was happy too as even when you do your best having both your bathrooms ripped out and replaced does impact on your living standard somewhat.

I am over the moon with the results and both look great though I am quite partial to the man’s shower room (it was a ‘his’ and ‘her’s’ job). It’s a proper man cave with big tiles and lots of chrome and the most unusual-looking basin I have ever fitted! Please take a look at my Checkatrade page to see all the pictures:

http://www.checkatrade.com/H2flowPlumbingAndHeating/